Biomass straw drying production line affected by uneven drying and wet straw material

Date2019-01-24 Back To List
  Straw drying production line must pay attention to the looseness of the material and the balanced water content when drying the straw. That is, it should pay attention to the uniform dryness and humidity of the input material.
 
 
  If the materials fed into the straw dryer equipment are not uniform, the material agglomeration phenomenon caused by the mixing of the wet and dry materials or the low working environment may be avoided by pulverizing the material before it is put into the equipment. The coal slime materials of the group are sent to the dryer for drying after being shredded. In the specific operation flow, the production process of the dryer must be strictly performed and the finished product quality and internal working environment in the equipment production must be carried out. Conduct frequent inspections to adjust the factors affecting the quality of the finished product in a timely manner to ensure that the production is carried out in a stable environment, so that the material achieves the desired drying effect to obtain high-quality, high-volume finished products. Welcome customers who are interested in newStraw drying production line equipment.

RECENT CASES

View More

COMPANY NEWS

View More

READ OUR FAQ

  • What is the process for purchasing equipment?

    Contact customer service - understand the basic situation - equipment quota-tion - sign contract - equipment production

  • What is the Quality of your products?

    Dingli Group products come with best quality, and our products passed CE certification, exported to lots countries around the word, such as Australia, Malaysia, India, Italy ,Indonesia, Vietnam, Philippines, Korea, Brazil, Argentina, Russia, South Africa, etc. You can rest assured with the quality absolutely.

  • What is the Installation of your products?

    Dingli Group has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for technicians' round way air tickets, food and lodging, most importantly to guarantee the technicians' safety.

  • What is the raw material for the production line? What is the capacity per hour you required?What is the maximum input size of the raw material?What is the output size and application for the final product?

    You can send inquiries from this page.Once we get your answers,we can provide you the best quotation immediately. Remarks: The price will depend on different models.

GET IN TOUCH WITH US